Mine - Storage Dams

Supply and installation of geosynthetics and leachate pipework for three mine storage dams.

Supply and installation of geosynthetics and leachate pipework across three separate dams - two brine dams with double-layer HDPE and one water dam with single-layer HDPE. Included 80,000 m² of smooth HDPE, single-sided textured HDPE wear liners, GCL, geocomposite, a leak detection system and dam depth indicators.

What was involved

  • Three mine storage dams (2 brine, 1 water)
  • Smooth HDPE (80,000 m²)
  • Single-sided textured HDPE wear liner
  • GCL
  • Geocomposite
  • Leak detection system
  • Dam depth indicators
  • Leachate pipework