Hazlewood

Installation of GCL and HDPE at a landfill remediation site.

Installation of 350,000 m² of GCL as a containment barrier and 50,000 m² of HDPE membrane as an additional protective layer.

What was involved

  • GCL (350,000 m²)
  • HDPE membrane (50,000 m²)