Calibre Estate - Bio-Retention Basin
Construction of a bio-retention basin, including excavation, HDPE lining and stormwater connection.

Clearing and grubbing of batter and trench line; excavation of the bio-retention basin; pond base preparation and removal of unsuitable materials; cut and backfill of the HDPE anchor trench; supply and installation of 1.5 mm HDPE membrane mechanically fixed to the sandstone wall; installation of pipework and pits; connection to the existing bio-retention basin; and supply and installation of bio-retention media to specification.
What was involved
- Clearing & grubbing
- Bio-retention basin excavation
- Pond base preparation
- HDPE anchor trench cut & backfill
- 1.5 mm HDPE membrane, mechanically fixed
- Pipework & pits
- Connection to existing basin
- Bio-retention media supply & install