Bund Lining Works

Remediation of chemical storage bunds at a bulk liquid storage terminal.

Tank lining bund works for a major bulk storage provider. Works included sub-floor preparation and excavation, installation of coated GCL with a polyurea coating for chemical protection, protection geotextile, concrete canvas, 800 m of mechanical fixing, a 200 mm crusher layer, dust coverage and electrical leak detection testing.

What was involved

  • Sub-floor preparation & excavation
  • Coated GCL
  • Polyurea coating
  • Protection geotextile
  • Concrete canvas
  • 800 m mechanical fixing
  • 200 mm crusher layer
  • Dust coverage
  • Electrical leak detection testing