PFAS Containment Cell
Supply & Installation of Geosynthetics

Cerberus VIC

Location

$1,700,000

Value

45 weeks

Duration

April 2023

Completion Date

Delta Group

Client

35,000m2

Materials Installed

Project Description

LMI excavated the cell, prepared the subgrade and completed the installation of geosynthetics.

Installed the geosynthetics which included GCL, XR5 Membrane, Protection Geotextile and Geocomposite.

LMI undertook the placement of the 20,000m3 PFAS contaminated materials and installed the capping geosynthetics which included a layer of a GCL, Black/White LLDPE, Cushion Geotextile and Geocomposite.

Following this LMI placed the soils cover layer and undertook the required drainage swale drains around the perimeter of the cell.